Stretching an attack line dry is a tactic for a set of very specific situations. A couple that come to mind are exterior stairwells, protected interior stairwells, and for tenable halls/corridors from a protected stairwell. With all of these, somebody must be assigned to mind the hose before it's charged and it must be laid out correctly in the stair well. In the photos below, you'll notice the hose on the 'inside' of the stairwell; it should be on the outside. Folds of hose can slip down…
ContinueAdded by Jason Hoevelmann on April 7, 2015 at 9:00am — No Comments
The login above DOES NOT provide access to Fire Engineering magazine archives. Please go here for our archives.
Our contributors' posts are not vetted by the Fire Engineering technical board, and reflect the views and opinions of the individual authors. Anyone is welcome to participate.
For vetted content, please go to www.fireengineering.com/issues.
We are excited to have you participate in our discussions and interactive forums. Before you begin posting, please take a moment to read our community policy page.
Be Alert for Spam
We actively monitor the community for spam, however some does slip through. Please use common sense and caution when clicking links. If you suspect you've been hit by spam, e-mail peter.prochilo@clarionevents.com.
Check out the most recent episode and schedule of UPCOMING PODCASTS
45 members
116 members
62 members
73 members
166 members
65 members
277 members
510 members
10 members
106 members
© 2024 Created by fireeng. Powered by
FE Home | Product Center | Training | Zones | Fire-EMS | Firefighting | Apparatus | Health/Safety | Leadership | Prevention | Rescue |