Fire Engineering Training Community

Where firefighters come to talk training

Which preconnect attack line loads do you recommend and why?

Views: 1680

Reply to This

Replies to This Discussion

2.5 inch with 250' on a dead man's lay allows for rapid deployment and is a manageable pull for staff, it can be easily added to when the length is not enough and can be reduced and split for overhaul.
the added advantages of the deuce allow for a more rapid knockdown of most fires however it is to be said that an 1.75' is far better for small fires and most room and content fires. However if you have more than one or so rooms involved then the higher gpm from the deuce would be my first choice despite the setbacks of needing added manpower to move the line around. The fact of the matter is; is that no two fires are alike and will do what is not expected of them from one moment until the next so being flexible and having different lines pulled will facilitate a speedy resolution of the problem.

Would lik to see the video



Rob Cannon said:

I have a video of me pulling the bumper line in the "2 and a loop method" that I would gladly share if anyone is interested.

Hi,

In Europe and South America we don't have such "word" to explain the way we do.

In fact I agree at 100% with Nate Brown: prepare correctly to avoid problem when using. Also, take a look at the places you will have to work in. Depending on the number of floor, you must not use the same method.

See that:

http://www.dailymotion.com/video/x3edkb_course-45-hp_tech

30 seconds after the truck stop, the team has a nozzle at about 300 feets,  flowing 135GMP (that's 1 3/4 hose line). For building, we use a system with such a box with 2 1/2 and hose line of 1 3/4 on shoulder. Our best time is less than 7 minutes at 11th floor with a team of two.

 

Best regards

Pierre-Louis

 

Note: we can't preconnect completly as our trucks don't have connectors inside.

Reply to Discussion

RSS

Policy Page

PLEASE NOTE

The login above DOES NOT provide access to Fire Engineering magazine archives. Please go here for our archives.

CONTRIBUTORS NOTE

Our contributors' posts are not vetted by the Fire Engineering technical board, and reflect the views and opinions of the individual authors. Anyone is welcome to participate.

For vetted content, please go to www.fireengineering.com/issues.

We are excited to have you participate in our discussions and interactive forums. Before you begin posting, please take a moment to read our community policy page.  

Be Alert for Spam
We actively monitor the community for spam, however some does slip through. Please use common sense and caution when clicking links. If you suspect you've been hit by spam, e-mail peter.prochilo@clarionevents.com.

FE Podcasts


Check out the most recent episode and schedule of
UPCOMING PODCASTS

Groups

© 2024   Created by fireeng.   Powered by

Badges  |  Report an Issue  |  Terms of Service