Fire Engineering Training Community

Where firefighters come to talk training

Our fire apparatus currently have two or three cross-lays. They are 1-3/4 inch, two of them are 200 feet in length and a 150 feet. We have a couple of progressive firefighters wanting to convert one of the cross-lays to 2-1/2 inch 200 feet. We have flow tested 2-1/2 inch attached to the 1-3/4 inch connection and able to get 325 gpm out of it. Yes, we have a 2-1/2 inch preconnect off the rear but it seems like we (as a department) forget about using it early in a fire and rely to heavily on the 1-3/4 inch cross-lays.

I feel that we should change the cross-lay to include a 2-1/2 inch but we are having heavy opposition from many of the other officers and members of the department.

Wanting to know how many other fire departments out there are using the 2-1/2 inch cross-lay and the reasoning behind it?

Views: 566

Reply to This

Replies to This Discussion

Thad! It depends what type of territory you have? In my area it would not work, because we have a three man ENGINE and water supply is always and issue (even in some hydrant areas). Last week I put out a 1200 square foot fully involved fire with and inch and three quarter line relatively quick. I truly feel it is who you have on the line as well. We do have a 3 inch blitz line on the back of our truck we pull at times. A good guy to talk to is Lt. Ray McCormick, he has some great ideas and suggestions. Let me know if you need anything. Take care, Todd McKee
Our territory encompasses approxiametly 100 square miles and includes city and rural areas. We have one engine setup for city responses, one setup for rural responses and another setup for heavy rescue but as a backup city engine. We have one ladder truck as a city response unit.

Even though we train on the 2-1/2" preconnect off the rear it seems like it is forgotten about when we have big fire. The crew grab the 1-3/4" cross lay most of the time.
Thad, search in Lt McCormick's 'Start Water' group. The entire thread is devoted to Engine Company operations. There have been a lot of discussions about 2 1/2 lines and smooth bore nozzles. If you want to find a bunch of good reasons to use them, you will find them there

Reply to Discussion

RSS

Policy Page

PLEASE NOTE

The login above DOES NOT provide access to Fire Engineering magazine archives. Please go here for our archives.

CONTRIBUTORS NOTE

Our contributors' posts are not vetted by the Fire Engineering technical board, and reflect the views and opinions of the individual authors. Anyone is welcome to participate.

For vetted content, please go to www.fireengineering.com/issues.

We are excited to have you participate in our discussions and interactive forums. Before you begin posting, please take a moment to read our community policy page.  

Be Alert for Spam
We actively monitor the community for spam, however some does slip through. Please use common sense and caution when clicking links. If you suspect you've been hit by spam, e-mail peter.prochilo@clarionevents.com.

FE Podcasts


Check out the most recent episode and schedule of
UPCOMING PODCASTS

© 2024   Created by fireeng.   Powered by

Badges  |  Report an Issue  |  Terms of Service