Fire Engineering Training Community

Where firefighters come to talk training

Tanker Discharge Procedures - Company Drill

Here’s another moving water drill.  If you missed the portable pond set-up drill, click here.  Move the water as you would in a water shuttle operation.  (Record and document times for later use with ISO).

Evolution Description:

The tanker stops at location A with 2-4 firefighters seat belted in.  To start evolution, the apparatus moves 200 feet to location B and discharges water load into a portable pond.  When the water discharge is complete, (ensure all firefighters are seat belted in prior to moving apparatus) the tanker moves 200 feet to location C and stops, which completes the evolution.

Read on.

Pass it on!

Views: 95

Comment

You need to be a member of Fire Engineering Training Community to add comments!

Join Fire Engineering Training Community

Policy Page

PLEASE NOTE

The login above DOES NOT provide access to Fire Engineering magazine archives. Please go here for our archives.

CONTRIBUTORS NOTE

Our contributors' posts are not vetted by the Fire Engineering technical board, and reflect the views and opinions of the individual authors. Anyone is welcome to participate.

For vetted content, please go to www.fireengineering.com/issues.

We are excited to have you participate in our discussions and interactive forums. Before you begin posting, please take a moment to read our community policy page.  

Be Alert for Spam
We actively monitor the community for spam, however some does slip through. Please use common sense and caution when clicking links. If you suspect you've been hit by spam, e-mail peter.prochilo@clarionevents.com.

FE Podcasts


Check out the most recent episode and schedule of
UPCOMING PODCASTS

Groups

© 2024   Created by fireeng.   Powered by

Badges  |  Report an Issue  |  Terms of Service