Tags:
Would lik to see the video
Rob Cannon said:
I have a video of me pulling the bumper line in the "2 and a loop method" that I would gladly share if anyone is interested.
Hi,
In Europe and South America we don't have such "word" to explain the way we do.
In fact I agree at 100% with Nate Brown: prepare correctly to avoid problem when using. Also, take a look at the places you will have to work in. Depending on the number of floor, you must not use the same method.
See that:
http://www.dailymotion.com/video/x3edkb_course-45-hp_tech
30 seconds after the truck stop, the team has a nozzle at about 300 feets, flowing 135GMP (that's 1 3/4 hose line). For building, we use a system with such a box with 2 1/2 and hose line of 1 3/4 on shoulder. Our best time is less than 7 minutes at 11th floor with a team of two.
Best regards
Pierre-Louis
Note: we can't preconnect completly as our trucks don't have connectors inside.
The login above DOES NOT provide access to Fire Engineering magazine archives. Please go here for our archives.
Our contributors' posts are not vetted by the Fire Engineering technical board, and reflect the views and opinions of the individual authors. Anyone is welcome to participate.
For vetted content, please go to www.fireengineering.com/issues.
We are excited to have you participate in our discussions and interactive forums. Before you begin posting, please take a moment to read our community policy page.
Be Alert for Spam
We actively monitor the community for spam, however some does slip through. Please use common sense and caution when clicking links. If you suspect you've been hit by spam, e-mail peter.prochilo@clarionevents.com.
Check out the most recent episode and schedule of UPCOMING PODCASTS
45 members
116 members
62 members
73 members
166 members
65 members
277 members
510 members
10 members
106 members
© 2024 Created by fireeng. Powered by
FE Home | Product Center | Training | Zones | Fire-EMS | Firefighting | Apparatus | Health/Safety | Leadership | Prevention | Rescue |