Fire Engineering Training Community

Where firefighters come to talk training

Jordan Smith's Blog – September 2008 Archive (1)

Should all 1st out apparatus have a RIT pack?

I was at my fire house the other day and a few of us were talking about the RIT pack. Do you think that all 1st out companies should have a RIT pack on board the apparatus? Why or why not? Any kind of feed back would be great.

Thanks
Jordan
EKCJFD

Added by Jordan Smith on September 12, 2008 at 9:49am — 3 Comments

Policy Page

PLEASE NOTE

The login above DOES NOT provide access to Fire Engineering magazine archives. Please go here for our archives.

CONTRIBUTORS NOTE

Our contributors' posts are not vetted by the Fire Engineering technical board, and reflect the views and opinions of the individual authors. Anyone is welcome to participate.

For vetted content, please go to www.fireengineering.com/issues.

We are excited to have you participate in our discussions and interactive forums. Before you begin posting, please take a moment to read our community policy page.  

Be Alert for Spam
We actively monitor the community for spam, however some does slip through. Please use common sense and caution when clicking links. If you suspect you've been hit by spam, e-mail peter.prochilo@clarionevents.com.

FE Podcasts


Check out the most recent episode and schedule of
UPCOMING PODCASTS

Groups

© 2024   Created by fireeng.   Powered by

Badges  |  Report an Issue  |  Terms of Service