Tags:
My departments response would be an engine with 3, Alpha unit with 2 and an engine with 5 from the other station. After a 360, if the fire was determined to be on the 2nd floor, the line would go up the stairs to the fire room. I would have the incoming engine lay a supply, stretch a second line to the 2nd floor and primary the floor (if practicle). Other personnel from 2nd engine would throw ladders to 2nd floor windows and probably search 1st floor. We use PPV so I would concider setting that up at front door and starting it once the attack is under way and conditions are assessed on the second floor.
I would be stretching 1 3/4" and concidering a 2nd alarm (for us that's 3 engines and a truck) depending on extention and location of fire.
With the flat roof, I'm thinking horizontal vent where the fire is already venting from. With the minimum manpower, that's about the extent until proven otherwise and 2nd alarm companies show up if requested.
Upon finding a h*** in the floor, I'd notify command of the situation and attempt to remove a door nearby and lay it over the h***. Command would be notified if this was successful or not.
I realize from reading all the posts on the community pages that in reality I wouldn't have enough manpower to "properly" address all the needs as readily as they appear in my response, but I attempted to address the initial work.
The more feed back to me the better. I'm not an officer yet but I'm wanting to prepare as best as I can. Thanks
KTF
Todd
First line 1-3/4'' to the fire. Have the second due eng secure water supply, investigate the h*** in the floor below and stretch the second 1-3/4'' to protect the interior stairway, means of egress. Have the truck ladder the side A window for rescue if needed and secondary means of egress,also ladder side D for secondary escape off the roof also have the truck set their arial ladder up for vertical ventilation. Dispatch a second alarm to assist with search and rescue and the RIT.
Couldn't help reading the thread before answering but I think all of the responses were in line with what I was thinking. Good idea with the lighting...we have a squad that is used primarily for support that is an excellent resource to be used at a fire like this. Wouldn't have thought of that on the fire!
Chief, I am assuming by your response that PPV would be wrong? Because I was thinking the same thing only because I think that I would increase visibility tremendously especially for the initial attack. In the SFH that we have responded to where we perform PPV initially as opposed to the ones that we delay due to fear of spreading the fire we have noticed that it runs a lot smoother and faster due to increased visibility. What are your thoughts?
One of the things that I did not see that would be of primary concern would be rescue operations due to the time of day. I would try to make certain that everyone was evacuated from the structure and if not, I would immediately begin rescue operations and set up my RIT team and have them check for secondary means of egress. Also, I would consider protecting that shed in the back since the fire is coming from the back of the structure and shed's normally have a lot of combustible materials in them.
Response would be Command 1, 2 engines 1 ladder and 2 rescues. I am the Captain that is being order to stretch a line to the second floor I would take a 1 3/4 preconnect into side A of the building. Second engine picks up the closest hydrant and supplies first engine company. Have second engine company perform a search on the floor below the fire, Ladder needs to position themselves so they can access two sides of the building, get to the roof and prepare for trench cut vent side B and C area. First arriving rescue pulls a 1 3/4 hose and enters to back up attack crew, Second rescue can pull 2 1/2 and monitor D side exposure. All resources are working Command needs to evaluate and consider an all hands providing the scene with a 3rd engine and rescue, moves mutual aid companies into the City to cover addition call. As far as the h*** I found by the stairs I would advise command to issue warning to all companies entering and maybe have a member of the 3rd rescue stand-by and control foot traffic in the area. Fire attack crew of second floor will perform a primary search of the second floor there is higher probability of fire victims due to the time of day. Once the fire has been brought under control I would request PPV from the A side front door. Then over haul.
search and evac are a primary concern and tactic. I didn't put a question for it. Still must be conducted. As far as the PPV, not a big fan (no pun intended). We in the northeast have tyoo many buildings with too many voids and unseen compromise. The last thing we want to do is push fire around. That could involve exposures. Always try to keep it to 1 building. Burning up your exposures , as Chief Byrunacini says, is tacky
Noel Marti said:Couldn't help reading the thread before answering but I think all of the responses were in line with what I was thinking. Good idea with the lighting...we have a squad that is used primarily for support that is an excellent resource to be used at a fire like this. Wouldn't have thought of that on the fire!
Chief, I am assuming by your response that PPV would be wrong? Because I was thinking the same thing only because I think that I would increase visibility tremendously especially for the initial attack. In the SFH that we have responded to where we perform PPV initially as opposed to the ones that we delay due to fear of spreading the fire we have noticed that it runs a lot smoother and faster due to increased visibility. What are your thoughts?
One of the things that I did not see that would be of primary concern would be rescue operations due to the time of day. I would try to make certain that everyone was evacuated from the structure and if not, I would immediately begin rescue operations and set up my RIT team and have them check for secondary means of egress. Also, I would consider protecting that shed in the back since the fire is coming from the back of the structure and shed's normally have a lot of combustible materials in them.
The login above DOES NOT provide access to Fire Engineering magazine archives. Please go here for our archives.
Our contributors' posts are not vetted by the Fire Engineering technical board, and reflect the views and opinions of the individual authors. Anyone is welcome to participate.
For vetted content, please go to www.fireengineering.com/issues.
We are excited to have you participate in our discussions and interactive forums. Before you begin posting, please take a moment to read our community policy page.
Be Alert for Spam
We actively monitor the community for spam, however some does slip through. Please use common sense and caution when clicking links. If you suspect you've been hit by spam, e-mail peter.prochilo@clarionevents.com.
Check out the most recent episode and schedule of UPCOMING PODCASTS
45 members
116 members
62 members
73 members
166 members
65 members
277 members
510 members
10 members
106 members
© 2024 Created by fireeng. Powered by
FE Home | Product Center | Training | Zones | Fire-EMS | Firefighting | Apparatus | Health/Safety | Leadership | Prevention | Rescue |