Fire Engineering Training Community

Where firefighters come to talk training

Hello everyone

I need specifications on NFPA 1710. At chapter 5.2.3.2.2 3) it is said that the FD must be able to establish a effective water flow application rate of 300 gpm from two handlines each of wich shall have a minimum of 100 gpm. Does this applie to high rise building? Do we have to establish two handlines from PRV'S in the building?. If not what, is the minimun water flow requier in high building?

thanks

the french guy from Montréal FD.

Views: 123

Policy Page

CONTRIBUTORS NOTE

Our contributors' posts are not vetted by the Fire Engineering technical board, and reflect the views and opinions of the individual authors. Anyone is welcome to participate.

For vetted content, please go to www.fireengineering.com/archive/.

Fire Engineering Editor in Chief Bobby Halton
We are excited to have you participate in our discussions and interactive forums. Before you begin posting, please take a moment to read our policy page. -- Bobby Halton

Be Alert for Spam
We actively monitor the community for spam, however some does slip through. Please use common sense and caution when clicking links. If you suspect you've been hit by spam, e-mail peter.prochilo@clarionevents.com.

FE Podcasts


Check out the most recent episode and schedule of
UPCOMING PODCASTS

© 2020   Created by fireeng.   Powered by

Badges  |  Report an Issue  |  Terms of Service